Welcome to Letters in the Lobby, our virtual representation of our physical office’s lobby display of letters of appreciation, praise and thanks for jobs well done by GENESYS. Because of the proprietary nature of what we do, we can’t always show you our work directly, so nothing speaks louder of our capabilities and dedication to success than our clients’ comments and referrals.
Our Letters in the Lobby are a testament to why we exist and the critical importance of what we do. They contain stories of “Problem Solved”, and we’re very proud of them. We literally see these letters every day, and they drive our dedication to delivering the Intense, Intellectual, Innovative, Invaluable and Incredible customer experience our clients demand and expect, on every job we do.
First and foremost the construction effort was accomplished accident free which was the result of a well planned and executed effort. The project met production goals in part from meeting the construction schedule and excellent quality of design and construction. Final costs for the project were in line with budget.
Beginning with my initial conversations with Dillon and into the jobsite meetings with Zach, Eddy and Russell, everyone did a really good job. It was clearly evident that a significant amount of planning was done on the front end by your team, which allowed you to execute to the schedule and startup the line about 12 hours early.
The team was very transparent with the schedule, additional costs, and production impacts. All information provided by the GENESYS team, and subs, was timely and given appropriate attention. When the job was kicked off, it was obvious that your team took the time to properly evaluate the cost and schedule.
I am pleased to say the project went very well. GENESYS designed, manufactured and installed a conveyor that is critical for delivering painted bodies to our Assembly department. Your team was given a short schedule to design, deliver and install this conveyor but was able to meet the challenge and exceed our expectations.
Wow... As I sit in my office back here in Houston and even try to contemplate all the events of this past week my head immediately begins to hurt. It is like a quick dream, I can’t believe everything that was accomplished and the effort put forth by everyone. It was truly a “Yeomen” effort. Thank you to every one of you.
Mike Brandt, project leader for GENESYS provided a very professional atmosphere and completed the job in a safe and timely manner. He provided total control from staging the equipment to disposal of all rail remnants. Mike provided the safety and leadership that I expect to see from our contractors (but don't always get).
I want to express my sincerest gratitude to GENESYS for a “job well done”. The attention to detail GENESYS provided during all phases of this project was exceptional. The project involved interfacing with existing equipment, refurbished or modified equipment and prototype equipment GENESYS designed for our processes. The project re-defined the word “integration”.
Thank you again for the innovative solutions and efficient use of manpower. The latest series of projects helps Volvo Powertrain to maintain their image of being World Class and incorporating safety in every design. These projects help our company save money in our processes, in turn returning more to our shareholders.
The new concept for driving, controlling and synchronizing our machinery increased our product quality and reduced noise levels beyond our expectations. GENESYS and Kasa made the transition seamless for our production people. Your attention to detail and communication made the job a complete success!
Our Clients Will Tell You.
Please take a moment to browse our virtual Lobby and you’ll understand why most of our clients find us through the kind referrals of our past, current and ongoing clients. They tell their peers to choose GENESYS because they understand our Core Values and Workplace culture breed an intense, infectious focus on excellence.